Integrated Project Delivery: Communication Architecture in Practice
DOI:
https://doi.org/10.69968/k5r0t086Keywords:
Integrated project delivery, Building Information Modeling (BIM), Communication Architecture, Digital TechnologiesAbstract
Integrated Project Delivery (IPD) is a team-based project delivery process that improves project performance by merging the people, processes, and project goals and by fostering open communication throughout the project process. This paper covers the basics, principles, contractual structures, communications and digital technologies that underpin IPD. It also reviews recent literature to identify the recent trends in the research, barriers in implementation, and future opportunities. The results revealed that while the development of BIM and collaborative contracting has facilitated the further development of IPD, communication architecture is still not well researched. New technologies like cloud computing, artificial intelligence, blockchain and the Internet of Things have great promise of improving communication, coordination and decision making. This review aims to give a brief overview of the communication architecture in IPD and suggests avenues for future research and industry use.
References
[1] A. Al Subaih and A. Dhabi, “Integrated Project Delivery: A Paradigm Shift for Oil and Gas Projects in the UAE and the Middle East Region,” 2015.
[2] H. Ashcraft, “Transforming project delivery: integrated project delivery,” Oxf. Rev. Econ. Policy, vol. 38, no. 2, pp. 369–384, 2022, doi: 10.1093/oxrep/grac001.
[3] L. S. Yee, “An Empirical Review of Integrated Project Delivery (IPD) System,” International Journal of Innovation, Management and Technology, pp. 1–8, 2017, doi: 10.18178/ijimt.2017.8.1.693.
[4] D. H. T. Walker and B. Lloyd-Walker, “2 CHARACTERISTICS OF IPD A Collaboration Framework overview,” Jul. 2020. [Online]. Available: www.tideway.london
[5] S. K. Lee and S. Ghosh, “Communication networks of an integrated project delivery team for construction: relationships between formal and informal communication networks,” Connections, vol. 40, no. 1, pp. 103–122, Jan. 2020, doi: 10.21307/connections-2019.016.
[6] N. Norouzi and M. Shabak, “Mohamed Rashid Bin Embi, Tareef Hayat Khan. Participation Problems and Communication Difficulties in Architectural Design Practice,” 2014. [Online]. Available: http://www.lifesciencesite.comhttp://www.lifesciencesite.com.145
[7] T. Bogers, J. J. Van Meel, and T. J. m. Van Der Voordt, “Architects about briefing: Recommendations to improve communication between clients and architects,” Facilities, vol. 26, no. 3–4, pp. 109–116, Feb. 2008, doi: 10.1108/02632770810849454.
[8] I. Onyegiri and C. Nwachukwu, “Information and communication technology in the construction industry,” American Journal of Scientific and Industrial Research, vol. 2, no. 3, pp. 461–468, Jun. 2011, doi: 10.5251/ajsir.2011.2.3.461.468.
[9] N. A. Kaufman, F. Collins, and H. Rogers, “AN INVESTIGATION OF CONSTRUCTION PROJECT COMMUNICATIONS UNDER IPD CONSTRAINTS,” in Annual Conference of the International Group for Lean Construction, IGLC, International Group for Lean Construction, 2025, pp. 1231–1242. doi: 10.24928/2025/0134.
[10] Z. Kahvandi, E. Saghatforoush, A. Zareravasan, and M. Lapaviana, “Manuscript Title A Review and Classification of Integrated Project Delivery (IPD) Implementation Enablers EARLY VIEW,” Dec. 2020. doi: 10.21315/jcdc2020.25.2.9.
[11] M. L. Viana, B. H. W. Hadikusumo, M. Z. Mohammad, and Z. Kahvandi, “Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study,” May 01, 2020, De Gruyter Open Ltd. doi: 10.2478/jeppm-2020-0017.
[12] N. A. Kaufman, F. Collins, and H. Rogers, “AN INVESTIGATION OF CONSTRUCTION PROJECT COMMUNICATIONS UNDER IPD CONSTRAINTS,” in Annual Conference of the International Group for Lean Construction, IGLC, International Group for Lean Construction, 2025, pp. 1231–1242. doi: 10.24928/2025/0134.
[13] S. P. Iwankovitsch and R. Jarrah, “Integrated Project Delivery and its Use in Construction,” CIB Conferences, vol. 1, no. 1, Jun. 2025, doi: 10.7771/3067-4883.1707.
[14] M. L. Viana, B. H. W. Hadikusumo, M. Z. Mohammad, and Z. Kahvandi, “Integrated Project Delivery (IPD): An Updated Review and Analysis Case Study,” May 01, 2020, De Gruyter Open Ltd. doi: 10.2478/jeppm-2020-0017.
[15] J. R. Surya and M. Kranti Kumar, “Barriers for Adoption of Integrated Project Delivery in Indian Construction Industry,” pp. 8–13, Mar. 2022, doi: 10.35940/ijmh.G1454.038722.
[16] S. A. Memon, M. M. Hanafiah, W. C. Tsang, N. S. Samsudin, M. Z. Mohammad, and S. Rowlinson, “A Review of Integrated Project Delivery: Expectation Versus Reality,” Buildings, vol. 16, no. 14, p. 2810, Jul. 2026, doi: 10.3390/buildings16142810.
[17] M. Khanna, F. Elghaish, S. McIlwaine, and T. Brooks, “Feasibility of implementing IPD approach for infrastructure projects in developing countries,” Journal of Information Technology in Construction, vol. 26, pp. 902–921, Nov. 2021, doi: 10.36680/J.ITCON.2021.048.